ARLINGTON 360 – CONSTRUCTION SCHEDULE
TWO WEEK LOOK AHEAD (8/18/2008-8/31/2008)
Rodent control (on going)
Sitework
-Rock processing
-Paving Hospital Road
-Building 3 Excavation